{"id":508288,"date":"2026-05-21T18:40:21","date_gmt":"2026-05-21T22:40:21","guid":{"rendered":"https:\/\/deultimominuto.net\/en\/uncategorized\/cibao-international-airport-presents-progress-on-its-new-terminal\/"},"modified":"2026-05-21T18:40:21","modified_gmt":"2026-05-21T22:40:21","slug":"cibao-international-airport-presents-progress-on-its-new-terminal","status":"publish","type":"post","link":"https:\/\/deultimominuto.net\/en\/uncategorized\/cibao-international-airport-presents-progress-on-its-new-terminal\/","title":{"rendered":"Cibao International Airport presents progress on its new terminal"},"content":{"rendered":"<strong>Santiago<\/strong>. \u2013 The <strong>International Airport<\/strong> of <strong>Cibao<\/strong> presented this Thursday the progress of the construction of its new terminal, a strategic work that contemplates an approximate investment of <strong>200<\/strong> million dollars in its first phase.\n\nDuring a meeting with media representatives, terminal executives offered details about the project's development, highlighting architectural, operational, and environmental aspects integrated into the new infrastructure.\n\nThe airport's general manager, <strong>Te\u00f3filo G\u00f3mez<\/strong>, thanked the press for their support and highlighted the importance of the expansion for strengthening the airport system of the North region and the country.\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/deultimominuto.net\/wp-content\/uploads\/2026\/05\/8da3130a-3546-471f-971d-09b930aa251c-1024x678.jpg\" alt=\"\" class=\"wp-image-659979\" title=\"\"><\/figure>\n\n\n\u201c<strong>This project represents a transcendental step for the strengthening of the airport infrastructure of the region and the country. The new terminal will significantly improve operational capacity and the passenger experience<\/strong>\u201d, expressed G\u00f3mez.\n\n\n<h5 class=\"wp-block-heading\"><strong>We recommend reading: <a href=\"https:\/\/deultimominuto.net\/economia\/aeropuerto-de-cabo-rojo\/\">Cabo Rojo Airport would be ready in February 2027<\/a><\/strong><\/h5>\n\n\nThe presentation was given by Cristina Rodr\u00edguez, Project Manager, who explained that the initiative is part of a broad expansion plan structured in three stages and that it is currently in the first phase of execution.\n\nAmong the works in progress, the airport authorities highlighted the installation of the structure's roofs, manufactured by a German company and made with high-quality treated wood, selected for its durability and environmental sustainability.\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/deultimominuto.net\/wp-content\/uploads\/2026\/05\/c4ae3792-baf9-4100-95a6-491dcff4c9b2-1024x678.jpg\" alt=\"\" class=\"wp-image-659980\" title=\"\"><\/figure>\n\n\nExecutives indicated that the design of the new terminal incorporates modern standards aimed at optimizing operational efficiency and strengthening the institution's commitment to sustainable development.\n\nAfter the presentation, journalists toured the work, where they could observe the construction progress and learn technical details of the project.\n\nThe expansion of the Cibao International Airport seeks to increase passenger reception capacity, improve airport services, and strengthen the tourism and commercial competitiveness of the Northern region in the international market.","protected":false},"excerpt":{"rendered":"<p>Santiago. \u2013 The International Airport of Cibao presented this Thursday the progress of the construction of its new terminal, a strategic work that contemplates an approximate investment of 200 million dollars in its first phase. During a meeting with media representatives, terminal executives offered details about the project&#8217;s development, highlighting architectural, operational, and environmental aspects [&hellip;]<\/p>\n","protected":false},"author":133558,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":{"0":"post-508288","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-uncategorized"},"acf":[],"jetpack_featured_media_url":"","dum_api":{"author_name":"Linda Veras","author_image":"https:\/\/deultimominuto.net\/wp-content\/uploads\/2026\/05\/cropped-WhatsApp-Image-2026-05-11-at-9.59.54-PM-96x96.jpeg","categories_name":["Uncategorized"],"featured_media_url":null},"_links":{"self":[{"href":"https:\/\/deultimominuto.net\/en\/wp-json\/wp\/v2\/posts\/508288","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/deultimominuto.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/deultimominuto.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/deultimominuto.net\/en\/wp-json\/wp\/v2\/users\/133558"}],"replies":[{"embeddable":true,"href":"https:\/\/deultimominuto.net\/en\/wp-json\/wp\/v2\/comments?post=508288"}],"version-history":[{"count":0,"href":"https:\/\/deultimominuto.net\/en\/wp-json\/wp\/v2\/posts\/508288\/revisions"}],"wp:attachment":[{"href":"https:\/\/deultimominuto.net\/en\/wp-json\/wp\/v2\/media?parent=508288"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/deultimominuto.net\/en\/wp-json\/wp\/v2\/categories?post=508288"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/deultimominuto.net\/en\/wp-json\/wp\/v2\/tags?post=508288"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}